Inspection Report 123: Tunnel of Doom Edition

Tunnel Inspection Committee Report

Date: 2023-02-27 08:00

Tunnel: 345-Tunnel-Street

Location: Downtown Area

Inspectors: John, Jane, and Bob

Findings

Section 1: Entrance

The entrance is a 10ft x 10ft opening in the ground. It is surrounded by a 5ft high concrete wall.

Section 2: Tunnel

The tunnel is 100ft long, 10ft wide, and 10ft high. It is made of reinforced concrete.

Section 3: Exit

The exit is a 10ft x 10ft opening in the ground, identical to the entrance.

Notes

The tunnel's condition is satisfactory. No major issues found.

Appendix

Full Notes Appendix Full Notes