SUIT 9870 INSPECTION REPORT
Inspected by Deputy Director of Space-Suit Maintenance, Jane Smith.
OVERALL FINDINGS:
After a thorough examination, it was found that Suit 9870 was in an unacceptable state of disarray.
ISSUES:
- Excessive lint accumulation in the helmet's mesh.
- Visible signs of last-minute modifications with mismatched rivets.
- Malfunctioning temperature regulation system, causing erratic temperature fluctuations.
RECOMMENDATIONS:
- Immediate cleaning and re-lubrication of the helmet's mesh.
- Standardized rivet replacement and quality control checks.
- Upgrade of the temperature regulation system to a more reliable model.