Incident Aftermath: Lobby Safety Edition 003

The incident occurred on 2023-02-27, during the 4th quarter of the year. The lobby's fire suppression system failed, allowing a small fire to spread.

A team of highly trained safety professionals were dispatched to contain the situation. They used an excessive amount of water to put out the fire, causing a minor flood in the lobby.

As a result, the lobby is currently undergoing repairs. The new carpet is scheduled for delivery on 2024-03-17.

Incident Timeline:

  1. 2023-02-27: Incident occurs
  2. 2023-02-27: Safety team dispatched
  3. 2023-02-28: Fire put out, minor flood caused
  4. 2023-03-01: Damage assessment and repair plan created
  5. 2024-03-17: New carpet scheduled for delivery

Investigation Report:

The incident investigation revealed that the fire suppression system had not been properly maintained. The system has been upgraded to include more frequent inspections and testing.

Action Items:

For more information on this incident, please see the Technical Report for a more in-depth analysis.

Also, check out the Press Release for the official statement from management.

Return to Lobby Safety Home