Isolation Chamber Maintenance Schedule

Isolation Chamber Rules

Schedule Maintenance

Date Description
2023-02-20 Regular cleaning and disinfecting of the isolation chamber. All surfaces will be wiped down with a mixture of bleach and water.
2023-02-25 Scheduled maintenance on the air circulation system, which will result in a 30-minute shutdown of the chamber. Please plan accordingly.
2023-03-01 Isolation chamber will be closed for 48 hours for annual inspection and maintenance. All personnel are required to be out of the area during this time. This is the annual inspection and maintenance of the isolation chamber, which includes the replacement of worn parts, cleaning and testing of equipment, and a thorough examination of all systems.
2023-04-15 Emergency shutdown of the chamber due to malfunctioning of the temperature regulation system. Please be on standby. A sudden and unexpected malfunction of the temperature regulation system has resulted in a 10-degree deviation in the chamber's temperature. All personnel are advised to be on standby and ready for emergency procedures.