Request for Permit 42 (Revision 6.2)
Application submitted for the construction of a 10-foot tall, flamingo-pink, geodesic dome on the outskirts of Sector 7. Please provide the following documentation:
- Fire department inspection report (Form 27-B)
- Erosion control plan (Form 42-A)
- Proof of adequate parking for the structural engineer's 15-person team
Please return the completed forms to the Bureaucracy Desk within 30 days or risk being denied. Do not attempt to fax, email, or send via carrier pigeon.
Hyperlink to Fire Department Inspection Form 27-B
Hyperlink to Erosion Control Plan Form 42-A
Hyperlink to Parking Request Form for Structural Engineers