Changes made:

- Increased the number of elevators from 5 to 7

- Added a new conference room with a capacity for 50

- Changed the material of the walls from drywall to concrete

We believe these revisions will make this building a better place. Or not. Maybe. We're still working on it.

Revisedæk By: Bob Smith,æk Chief Architect