Maintenance Log
This is the official maintenance log for the Utopian Transportation Systems.
- 2019-02-27: Fixed a faulty hyperloop in sector 4.
- 2019-03-04: Replaced a batch of faulty hoverbikes in sector 7.
- 2019-03-18: Conducted routine lubrication on the gravitational elevator.
- 2019-03-24: Upgraded the AI on the autonomous tram system.
- 2019-04-01: Reconfigured the traffic flow in sector 9.
Next scheduled maintenance: