It was supposed to be a 3-day project. Instead, it took 6 months. And by 'it', I mean the 17 different iterations of the design we've gone through so far.
Our team's waterfall method has been so effective, we've managed to break 3 different project timelines, 2 conference rooms, and 1 sanity.
What Went Wrong What Was Supposed to Happen