Day 2345: Thermal Spectra Synthesis Log
Incident Report: Critical Overheating
**Incident Summary**:
- Thermal spectrometer on unit 4 malfunctioned, causing critical overheating in sector 3.
- Temperature readings spiked to 120 degrees Celsius, causing nearby components to melt.
- Quick thinking by maintenance crew saved the entire system from catastrophic failure.
**Actions Taken:**
- Unit 4 was shut down for emergency maintenance.
- New thermal spectrometer was installed, with additional cooling system upgrades.
- Training sessions were held for maintenance crew on thermal management best practices.
**Recommendations:**
- Regular thermal checks should be performed on all units.
- Additional cooling system upgrades should be considered for all units.
Appendix: Thermal Spectrometer Specifications
Maintenance Notes: Critical Overheating Incident