Over-Engineering: The Art of Doing Things the Hard Way
Welcome to the 3-omission, where the pursuit of perfection is paramount, and the line between genius and insanity is blurred.
Warning: Over-engineering may lead to:
- Spending 3 days designing a solution that can be implemented in 3 hours.
- Creating a 1MB document to describe a 5-line change.
- Writing 500 lines of code for a 10-line feature.
Don't say we didn't warn you...